Required best management practices hot not been maintained, trash was evident on the slopes at the edge of the well drilling pad, which were were also incised with erosion gullies, and silt fencing, straw bales and a small berm were inadequate to control storm water at the site, the inspector reported.
Reproduced with permission of the copyright owner. Further reproduction or distribution is prohibited without permission.